News

What have we been up to?

From Bangkok to Bangalore,

Colombo to Cagayan de Oro,

All the news from around CDIA

Executive Summary Chennai Pre-Feasibility Study – Solid waste

August 12, 2011

Share

Background The prime objective of this project support was to carry out Pre-Feasibility Studies (PFS) to prepare investment plans for infrastructure projects for the sectors of waterways and solid waste in Chennai for potential funding. The JnNURM mechanism forms the fundamental framework for potential funding for the projects identified. The Chennai Waterways Improvement Project has […]

Executive Summary Chennai CDP Review

August 12, 2011

Share

Introduction The purpose of the Chennai City Development Plan 2009 (CDP) is to update the 2006 CDP that was prepared as part of the Government of India’s Jawaharlal Nehru Urban Renewal Mission (JNNURM) funding application process. The revised CDP 2009 will guide development of the Chennai Metropolitan Area through to the year 2026. The need […]

Executive Summary Battambang Pre-feasibility Study

August 12, 2011

Share

The “Urban Environmental Infrastructure Improvement Project – Battambang, Cambodia” was performed for CDIA during 2010. Main issues were: Sewerage / wastewater collection and treatment Drainage Solid Waste management The existing Wastewater treatment plant was covered at a very limited extent, so CDIA decided to perform a separate study of this plant, in the form of […]

Project Overview: Khulna, Bangladesh

August 12, 2011

Share

Khulna is the third largest city in Bangladesh. It is located on the banks of the Rupsha and Bhairab rivers in Khulna District. It is the capital of Khulna Division and a major industrial and commercial center. The city is 333 km southwest of Bangladesh’s capital Dhaka, to which it is connected by air, road, […]

Project Overview: Battambang, Cambodia

August 12, 2011

Share

Battambang is Cambodia’s second-largest city and the capital of Battambang Province. The city is the main hub of the Northwest connecting the entire region with Phnom Penh and Thailand and as such is a vital link for Cambodia. Project Overview: Battambang, Cambodia City: BATTAMBANG Key Sectors: ENVIRONMENTAL INFRASTRUCTURE Status: Completed » Download Project Overview

Project Overview: Danang, Viet Nam

August 12, 2011

Share

Danang is a major port city in the South Central Coast of Vietnam, at the eastern terminus of the GMR’s East-West corridor. The city is divided in six (6) urban and two (2) rural districts with the population being 86% urban. Project Overview: Danang, Viet Nam City: Danang Key Sectors: WASTEWATER MANAGEMENT, DRAINAGE Status: Completed » Download […]

Project Overview: Greater Suva Area, Fiji

August 12, 2011

Share

Fiji has a national population of 849,000 persons, of which approximately 51% live in urban areas. An estimated 57% (244,000) of this urban population lives in the Greater Suva Area (GSA), comprising the City and Town Councils of Lami, Suva, Nasinu and Nausori. Project Overview: Greater Suva Area, Fiji City: GREATER SUVA AREA Key Sectors: […]

Financing Instruments for Mitigation Measures in Indonesia

July 29, 2011

Share

A report is now available on “Existing Local and National Available Financing Instruments for Mitigation Measures in Indonesia“.

This study aims to identify existing and possible financial options for mitigation action at the city/district level by the local government In Indonesia. The work consists of the identification of the appropriate…Read More

CITYNET and CDIA sign MOU

July 22, 2011

Share

A Memorandum of Understanding (MOU) between CITYNET and CDIA was signed at the Executive Committee meeting of CITYNET in Bangkok, Thailand.

CITYNET and CDIA share a common agenda to support urban governments in the Asia-Pacific region to promote more sustainable and equitable urban development that will result in improved environmental and living conditions in Asian…Read More

Page 51 of 62« First...102030...4950515253...60...Last »
Back to Top